| Waste Diversion |
Demolition and Salvage |
Five Lower Mainland deconstruction projects show how much demolition material can be salvaged and recycled economically.
more |
Job Site Recycling |
Find out how seven Lower Mainland builders saved money by changing their on-site waste management practices.
more |
| Residential |
Koo’s Corner |
Green strategies used: This Vancouver townhouse development was built in a cleaned-up former industrial site with high energy- and water-efficient features. Over 75% of demolition materials stayed out of the landfill and indoor environmental quality is high.
more |
The Silva |
Canada’s first LEED® high-rise residential development, this building featured high energy- and water-efficient features, reduced construction waste and high indoor environmental quality.
more |
Yorkson Village |
Green strategies used: Located in Langley in 2007, this 55-home development was Canada’s first Built Green community.
more |
Hanvey Residence |
Green strategies used: This green renovation featured high reuse and recycling of demolition and construction waste, reduced energy and water use, high use of green building materials and good indoor air quality.
more |
| Municipal |
Richmond City Hall |
Green strategies used: This modern facility emphasizes use of natural lighting and ventilation, increased energy- and water-efficiency.
more |
City of Vancouver |
Green strategies used: This new building features energy-efficient heating and cooling systems, reduced water use, high diversion of demolition and construction waste from landfills use of recycled-content building materials and improved indoor air quality are some of the features of this City of Vancouver facility.
more |
City of White Rock |
Green strategies used: This new operations facility offers environmentally advanced design, renewable energy systems, water conservation techniques, improved indoor air quality and energy-efficient heating and cooling systems. more |
Semiahmoo Library |
Green strategies used: By using an abundance of natural light this library building is energy efficienct, features exceptional air quality and was the first library in Canada to be LEED-cerrtified when it was comipleteed in 2003.
more |
Gleneagles Community Centre |
Green strategies used: This community centre uses energy-efficient heating and cooling systems.
more |
| Commercial |
Maxem Holdings |
Green strategies used: Green strategies used: Salvaged materials, fly ash concrete, external solar shading devic
more |
Revenue Canada |
Green strategies used: Energy efficiency, high use of natural light and ventilation, flexilibility and easy adaptability of floor plan
more |
Omicron |
Green strategies used: Reduced water and energy use, almost 75% of construction waste diverted from landfill, high use of recycled building materials. The first building in Canada to achieve LEED® Gold under the US Green Building Council’s new rating system for Commercial Interiors.
more |
Technology Enterprise Facility III |
Green strategies used: Energy and water conservation, reduced construction waste, enhanced indoor air quality and use of recycled materials
more |
Hughes Condon Marler: Architects’ (HCMA) |
Green strategies used: Energy and water conservation, use of natural light and operable windows for all workstations, high reuse and recycling of demolition materials and recycled content in building materials and furniture
more |
| Case studies from outside Metro Vancouver |
High Performance Buildings Deliver Productivity Improvements |
From the City of Seattle, a series of case studies focusing on “Worker Productivity Improvements” in high performance buildings.
more |
Advanced Buildings |
A building professional's guide to more than 90 environmentally-appropriate technologies and practices hosted by PWGSC and CMHC.
more |
Beddington Zero (fossil) Energy Development (BedZED) |
The BedZED was conceived to show that in large scale construction a high level of sustainability can be practical and cost effective. more |