North Road SewerNorth Road Sewer<div class="ExternalClass3FF914B54E564BB3954F26A8E4306DCB"><p>​The North Road Sewer pipe collects sewage from Burnaby and Coquitlam, and carries it to the Annacis Island Wastewater Treatment Plant. To ensure wastewater continues to be managed safely and to accommodate growth, the North Road Sewer pipe needs to be upgraded.</p><p>Construction will take place in multiple phases and is expected to begin in September 2019 and continue for approximately 9 months.</p> </div>North Road, from just north of Lougheed Highway to Hume Park Road

 

 

NorthRoadMaphttp://www.metrovancouver.org/services/liquid-waste/construction-maintenance/ConstructionProjectPictures/_t/NorthRoadMap_jpg.jpghttp://www.metrovancouver.org/services/liquid-waste/construction-maintenance/ConstructionProjectPictures/Forms/DispForm.aspx?ID=63&RootFolder=/services/liquid-waste/construction-maintenance/ConstructionProjectPicturesNorthRoadMap

Project Update


  • CONSTRUCTION UNDERWAY - posted on January 20, 2020

    Construction will be taking place along North Road from Rochester Street to Gatineau Place. All work will take place during the evening from 8:00 pm to 6:00 amTraffic will be reduced to a single lane in each direction within the work zone. 

    Sidewalk access may be restricted at times. Pedestrians should expect to encounter construction crews, equipment, noise and dust. Please use extra caution and follow signage and the direction of traffic control personnel. 


 

 

<div class="ExternalClassEFCEFB0BAB114BAFBAAA1EAE1CC215F8"><p>Impacts associated with this work include:</p><div class="ExternalClass829F66DFD77D4822A79C397BF342F8B8"><ul><li>Temporary road closures and delays</li><li>Temporary property access restrictions (alternate access points will be provided and advance notice will be given)</li><li>Increased truck traffic on nearby roads</li><li>Noise</li><li>Dust<span aria-hidden="true"></span></li></ul></div></div><div class="ExternalClass0A1D637DEEBA4B7295A647F8540A20B4"><p>Work will occur from Monday to Friday, between 7:00 a.m. and 8:00 p.m. and Saturday between 9:00 a.m. and 6:00 p.m. To avoid significant impacts to traffic along Lougheed Highway, night work will occur between the T-intersection (where Rochester Street meets North Road) and 110m north of Lougheed Highway. </p><p>Crews will make efforts to complete the work in a timely manner and reduce impacts to local residents and businesses. However, there may be times when crews will be required to work extended hours in order to complete specific tasks and/or stay on schedule.</p></div><div class="ExternalClass74F378665E9546F59580AAF93F0B1EF2"><p>​Metro Vancouver invited residents to learn more about the North Road Sewer Project at an event held on July 24, 2019 at the Hannam Supermarket in Burnaby. See the <a href="/services/liquid-waste/construction-maintenance/ConstructionProjectPublications/NorthRoad-DisplayPanels-20190718.pdf" target="_blank">Display Boards</a> for project information. </p></div><div class="ExternalClassE83D49BA8F40445EB20C1DDCC641EE53"><p>A Community Liaison Officer will be available to ensure concerns and interests are heard and considered.</p><p>To receive updates about this project, please e-mail <a href="mailto:icentre@metrovancouver.org">icentre@metrovancouver.org</a> with the subject "North Road".</p></div>

 

 

September 2019 – Summer 2020

 

 

Mobilization Letterhttp://www.metrovancouver.org/services/liquid-waste/construction-maintenance/ConstructionProjectPublications/MobilizationNewsletter-NorthRoadSewerUpgrade-2019-06-03.pdfMobilization Letter
July 24, 2019 Information Session Invitehttp://www.metrovancouver.org/services/liquid-waste/construction-maintenance/ConstructionProjectPublications/PC_Event_Invite_-_North_Rd_Sewer_2019-07-02.pdfJuly 24, 2019 Information Session Invite
Fact Sheet http://www.metrovancouver.org/services/liquid-waste/construction-maintenance/ConstructionProjectPublications/NorthRoad-Factsheet.pdfFact Sheet

 

 

<div class="ExternalClassEABB6B5038664C72B9263821FB75DB93"><p>Community Liaison Officer<br><strong>Monday to Friday (8:00 a.m. - 4:30 p.m.)</strong> <br>604-432-6200</p><p><strong>After-hours Emergencies</strong>: 604-451-6610<br></p><p><strong>Email</strong>: <a href="mailto:icentre@metrovancouver.org">Information Centre</a></p></div>

Stay Connected


Subscribe to our mailing list to receive e-newsletters about our Liquid Waste engagement projects

 

Sign up