North Road Sewer

 

 

North Road SewerNorth Road Sewer<div class="ExternalClass3FF914B54E564BB3954F26A8E4306DCB"><p>​The North Road Sewer pipe collects sewage from the Cities of Burnaby and Coquitlam, and carries it to the Annacis Island Wastewater Treatment Plant in the City of Delta. To ensure wastewater continues to be managed safely and to accommodate regional growth, upgrades to the North Road Sewer pipe are necessary.<br></p><p>Construction will take place in multiple phases. The first phase of the project, extending from Hume Park Road to Gatineau Place is expected to begin in September 2019 and will continue for approximately 9 months.  <br></p> </div>North Road, north of Lougheed Highway to Hume Park Road

 

 

North Road Sewer Upgradehttp://www.metrovancouver.org/services/liquid-waste/construction-maintenance/ConstructionProjectPictures/_t/North%20Road%20Sewer%20Upgrade%20July%202020_jpg.jpghttp://www.metrovancouver.org/services/liquid-waste/construction-maintenance/ConstructionProjectPictures/Forms/DispForm.aspx?ID=138&RootFolder=/services/liquid-waste/construction-maintenance/ConstructionProjectPicturesNorth Road Sewer Upgrade

Project Update


  • THE FIRST PHASE OF THE NORTH ROAD SEWER UPGRADE PROJECT IS COMPLETE! - posted on July 21, 2020

    Thank You!

    Metro Vancouver has now completed the replacement of the sewer along North Road between Hume Park and Gatineau Place in the Cities of Burnaby and Coquitlam.

    The new, larger pipe that is now in place helps ensure that wastewater continues to be safely and reliably managed in the Metro Vancouver region. 

    Thank you for your continued patience and understanding during construction of this essential sewer infrastructure project in your neighbourhood.

    The next phase of this project located along the BNSF Railway Overpass just south of the Highway One Overpass is expected to begin in 2021.


 

 

<div class="ExternalClass1313048226384D3B840A812AB6BFFAF7"><p>Starting September 2019, activities associated with this project will include:</p><ul><li>Trucks delivering materials <br></li><li>Storing materials and equipment<br></li><li>Cutting pavement<br></li><li>Digging up one lane of roadway and preparing the trench for pipe installation<br></li><li>Use of an excavator or vacuum truck to dig small holes in the ground <br></li><li>Backfilling, repaving the trench and surface restoration<br></li></ul><p><br></p></div><div class="ExternalClassEFCEFB0BAB114BAFBAAA1EAE1CC215F8"><p>Metro Vancouver will actively monitor traffic flows and activity in the project area throughout construction. During this work there will be: </p><div class="ExternalClass829F66DFD77D4822A79C397BF342F8B8"><ul><li>Temporary road closures and traffic delays</li><li>Temporary property access restrictions (alternate access points will be provided and advance notice will be given)<br></li><li>Increased truck traffic on nearby roads<br></li><li>Temporary sidewalk restrictions along North Road between Hume Park Road and the intersection of North Road and just north of Lougheed Highway<br></li></ul><div><br></div><div>Please follow the direction of signage and traffic control personnel. <br></div></div></div><div class="ExternalClass0A1D637DEEBA4B7295A647F8540A20B4"><p>Work will occur from Monday to Friday, between 7:00 a.m. and 8:00 p.m. and Saturday's between 9:00 a.m. and 6:00 p.m. To avoid significant impacts to traffic along Lougheed Highway, night work will occur between the T-intersection (where Rochester Street meets North Road) and 110m north of Lougheed Highway. </p><p>Crews will make efforts to complete the work in a timely manner and reduce impacts to local residents and businesses. There may be times when crews will be required to work extended hours to complete specific tasks and stay on schedule. <br></p></div><div class="ExternalClass74F378665E9546F59580AAF93F0B1EF2"><p>​Metro Vancouver is committed to minimzing the impacts of construction on the community. Local residents and businesses will receive ongoing notification about the project through newsletters, web updates, email and on-site signage. <br></p><p>On July 24, 2019, Metro Vancouver invited residents to learn more about the North Road Sewer Upgrade project at an event held at the Hannam Supermarket in Burnaby. See the <a href="/services/liquid-waste/construction-maintenance/ConstructionProjectPublications/NorthRoad-DisplayPanels-20190718.pdf" target="_blank">Display Boards</a> for more information.<br></p></div>

 

 

First Phase: September 2019 – July 2020

 

 

Fact Sheet http://www.metrovancouver.org/services/liquid-waste/construction-maintenance/ConstructionProjectPublications/NorthRoad-Factsheet.pdfFact Sheet

 

 

<div class="ExternalClassEABB6B5038664C72B9263821FB75DB93"><p><strong>Monday to Friday (8 am - 4:30 pm)</strong> <br>Community Liaison: 604-432-6200</p><p><strong>After-hours Emergencies</strong>: 604-451-6610<br></p><p><strong>Email</strong>: <a href="mailto:icentre@metrovancouver.org">Information Centre</a></p></div>